Herunterladen Inhalt Inhalt Diese Seite drucken

Opening And Closing Of The Cover; Connection On Heating Side - Dimplex La 60P-Tur Montage- Und Gebrauchsanweisungen

Vorschau ausblenden Andere Handbücher für LA 60P-TUR:
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
English
7.2 Opening and closing of the
cover
All panelling can be removed to allow access to the inside of the
device. Note that the upper covers can only be removed after
the lower covers have been taken off.
Opening and closing of the bottom cover
The two sash fasteners must be opened for this purpose. The
cover must then be slightly tilted forward and lifted off toward
the top.
3.
2.
1.
2.
1.
Opening the lower covers
Opening and closing of the top cover
The upper panels are hooked into the cover panel. To disman-
tle, open the two screws and unhook the panels by pulling them
back.
2.
2.
3.
3.
1.
Opening the upper cover panels
EN-12
2.
1.
3.
2.
3.
Closing the lower covers
2.
2.
1.
1.
Closing the upper cover panels
452167.66.42 · FD 0008
Opening the connection box
In order to open the cover plate on the connection box, the top
cover panel must first be removed. For this purpose, open both
screws and unhook the panel by pulling it back. The three
screws of the cover panel for the connection box can then be
loosened and the panel can be removed by pulling it forward.
1.
1.
Opening the upper cover panel over
the connection box

7.3 Connection on heating side

The connection on the heating side must be carried out by
trained personnel using personal protective equipment. Refer
to the device information for the connection sizes.
A spanner must be used to firmly grip the transitions when con-
necting the heat pump. After the heat pump has been installed,
the ductwork must be sealed so that the connection is gas-
tight.
CAUTION!
Flush the heating system prior to connecting the heat pump.
Before connecting the heating water system to the heat pump,
the heating system must be flushed to remove any impurities,
residue from sealants, etc. Any accumulation of deposits in the
liquefier may cause the heat pump to completely break down.
Once the heat pump has been connected to the heating sys-
tem, it must be filled, purged and pressure-tested.
CAUTION!
1.
The leakproofness of the hydraulic circuit must be ensured
3.
and checked regularly.
3.
NOTE
The response pressure of the safety valve in the heat pump is
2.5 bar(g).
2.
3.
4.
3.
Opening the cover panel for the con-
nection box
www.glendimplex.de
LA 60P-TUR
3.
Inhaltsverzeichnis
loading

Inhaltsverzeichnis