Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Of Uv Streamer Air Purifier Unit; Risk Of Electric Shock - Daikin BAEF125AWB Installationsanleitung

Uv-diffusionsluftreiniger
Vorschau ausblenden Andere Handbücher für BAEF125AWB:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 24

6. INSTALLATION OF UV STREAMER AIR PURIFIER UNIT

DANGER: RISK OF ELECTROCUTION
Indicates a situation that could result in electrocution.
DANGER: RISK OF ELECTROCUTION
• Turn OFF all power supply before removing the switch box cover, connecting electrical wiring or touching
electrical parts.
• Disconnect the power supply for more than 1 minute, and measure the voltage at the terminals of main
circuit capacitors or electrical components before servicing. The voltage MUST be less than 50V DC
before you can touch electrical components. For the location of the terminals, see the wiring diagram.
• Do NOT touch electrical components with wet hands.
• Do NOT leave the unit unattended when the service cover is removed.
WARNING
For installation work

RISK OF ELECTRIC SHOCK

• To prevent electric shock, be sure to perform earth work.
• Earth work must be carried out by an electrician.
• Install an earth leakage breaker according to the indoor/outdoor unit installation manual.
• Before opening the electrical component box lid, be sure to always shut off all power supplies.
1. Remove the protective net.
(1) Remove the tapes securing the 2 hooks (protective net) to turn the 2 hooks (protective net).
(Refer to Figure 4.)
(2) Lift the protective net slowly by pivoting around the latching hooks. (Refer to Figure 5.)
(3) Unhook the protective net and pull it out. (Refer to Figure 6.)
2. Remove pleated filter (1) from the UV streamer air purifier unit.
(1) Remove the tapes securing the power supply and signal wires.
(2) Remove the tapes securing the hooks (filter) (2 locations).
(3) Remove the tape securing pleated filter (1).
(4) Hold pleated filter (1) at the part indicated in Figure 8 and pull it out.
(Holding at another part may crush the pleats of pleated filter (1).)
English
01_EN_3P701968-3.indd 8
01_EN_3P701968-3.indd 8
Latching hook
Hook (Protective net) 2 locations
Figure 4
Protective net
8
12/05/2023 15:12:26
12/05/2023 15:12:26

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis