Herunterladen Inhalt Inhalt Diese Seite drucken

Connection To The Electric Network - Saeco NEXTAGE CAP010 Bedienung Und Wartung

Vorschau ausblenden Andere Handbücher für NEXTAGE CAP010:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

English
5.4
Connection to the Electric
Network
The
Technician,
charge of the appliance's
installation, shall make sure
that:
• the power supply system complies with the safety
instructions in force;
• the voltage corresponds to that indicated on the appliance
data plate.
In case of doubt, do not
proceed
installation and ask qualified
and authorised personnel
to accurately check the
system.
Also make sure that the
electrical
appliance is connected to
has the capacity to bear
the max load required, as
indicated on the data plate.
78
Maintenance
who
is
in
with
the
system
the
G
Power cord type H07RNF sec. 3x2.5 mm2
Insert the power cord (G) into the hole A.
G
Power cord type H07RNF sec. 3x2.5 mm2
N
Neutral
L1
Phase
T
Ground
Depending
regulations in force in the
Country where the machine
is being used, the cable
connecting to the power
supply has to be pre-set or
equipped with an all-pole
switch (with a minimum
contact opening of 3 mm),
or with a plug complying
with the same regulations.
on
the

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis