Herunterladen Inhalt Inhalt Diese Seite drucken

Alignment Instructions - Ossur CHEETAH KNEE Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für CHEETAH KNEE:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 8
2. Align the Pinch Bolt (1E) of the Male Pyramid Adapter (1D), 4-Prong
Socket Adapter (1A), and the Euro 4-hole Adapter (1C) perpendicular
to the anterior/posterior axis of the device, except for the Female
Pyramid Adapter (1B), which should be angled 45°.
Caution: Maximum connection strength will not be established unless
the adapter is correctly aligned.
3. For secure fastening to the device, tighten the adapter's Pinch Bolt
according to its instructions for use.
Caution: Do not tighten the proximal adapter against the housing of
the device.
Caution: When prong adapters are used, resin may get under the
adapter and hinder full thread engagement. Carefully remove resin
without damaging the adapter so that adapter threads can be fully
engaged when mounted on the device.

ALIGNMENT INSTRUCTIONS

Bench Alignment (Fig. 2)
Alignment Goal
Alignment reference line (B) should:
– pass through midpoint of socket at the ischial tuberosity level (D)
– pass through pivot axis (A)
– fall at the 1/3 mark on the inside of the foot cover. 
Note: Prioritize knee alignment over foot alignment if there is a
mismatch.
Alignment Instructions
1. Position the foot so that the alignment reference line (B) falls at the
1/3 mark on the inside of the foot cover (with the foot cover and shoe
on). Consider the external rotation of the foot. 
2. Use the applicable adapters to connect the knee to the foot and
establish the correct knee center height.
3. Position the knee so that the alignment reference line passes through
pivot axis (A)
4. On the lateral side of the socket, make a first mark at the midpoint of
the socket at the ischial tuberosity level (D). Make a second mark at
the midpoint of the socket distally (E). Draw a line through both
marks.
5. Position the socket so the alignment reference line (B) goes through
first mark at the midpoint of the socket at the ischial tuberosity level
(D).
6. Adjust the socket flexion to 5° in addition to the existing position (i.
e., hip flexion contracture) and set the height of the full prosthesis.
7. Use the applicable adapters to connect the knee to the socket.
Warning: After adjustments, all screws must be secured with a medium
strength threadlocker and tightened with the correct torque.
Tighten the screws with the following torque:
• Proximal Adapter Pinch Bolt (Fig. 1:E): Please refer to the respective
proximal adapter's instructions for use.
Static Alignment
– Make sure the patient stands with equal weight on both legs.
– Check for correct prosthesis length.
– Check internal / external rotation.
– Check for correct load on toe and heel.
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis