Herunterladen Inhalt Inhalt Diese Seite drucken

Scope Of Delivery; Goods-In Inspection - Abicor Binzel FEC Originalbetriebsanleitung

Hochvakuum rauchgas-absauggerät
Vorschau ausblenden Andere Handbücher für FEC:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

FEC

3 Scope of delivery

The following components are included in the scope of supply:
— 1× FEC fume extraction system with electrical power supply of 115/230 V
— 1× cap
— 1× extraction hose (l = 5.00 m)
— 1× "Operating Instructions" document
— 2× FEC filter pad
— 5× dust collecting bag
The following components are available as an option:
— Current clamp
► Order the equipment parts and wear parts separately.
► The order data and ID numbers for the equipment parts and wear parts can be found in the current
product catalog.
► For more information about points of contact, consultation, and orders, visit www.binzel-abicor.com.
Although the items delivered are carefully checked and packaged, it is not possible to fully rule out the risk
of transport damage.

Goods-in inspection

► Check for order completeness by checking the delivery note.
► Check the delivered goods for damage (visual inspection).
Claim process
► If goods are damaged, contact the final carrier.
► Keep the packaging for possible checks by the carrier.
Returns
► Use original packaging and packing material for returns.
► If you have questions concerning the packaging or how to secure the device, contact your supplier,
carrier or transport company.
3 Scope of delivery
EN - 9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis