Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking Rotopol; Placing Rotopol; Supplying Power; Supplying Water - struers RotoPol-11 Gebrauchsanweisung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Unpacking RotoPol

Placing RotoPol

Supplying Power

Supplying Water

Connecting the Water Inlet

4
RotoPol-11/-15
Instruction Manual
Detach RotoPol from the bottom of the packing case by removing
the four screws from below.
Place RotoPol on a steady table with an adequate working height.
The machine must be close to the power supply, water mains and
water outlet facilities. If water recirculation is used, there must
be room under the table for the Recirculation Cooling Unit
(TRECI).
The mains cable of RotoPol is either equipped with a standard
electric male plug, type "F" or with a male flat blade attachment
plug. If the type of plug delivered with the equipment has not
been approved for local use, the plug must be replaced with an
approved type. The leads have to be connected as following:
Yellow/green: earth
Brown: phase
Blue or Black: neutral
Check that the mains voltage corresponds to the voltage stated on the type
plate on the back of the machine.
Insert the female plug of the power cable into the socket on the
back of the machine.
Connect the male plug to a grounded electric outlet.
Water for wet grinding may be supplied from the water mains or
a Recirculation Cooling Unit.
Mount the straight end of the pressure hose onto the water
inlet tube (upper) on the back of RotoPol (see drawing on the
previous page):
− Insert the filter gasket in the coupling nut with the flat side
against the pressure hose.
− Tighten the coupling nut completely.
IMPORTANT
DANGER!
The machine must be earthed

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rotopol-15

Inhaltsverzeichnis