4. Sanitization: Needs to be agreed with the customer.
Prior to initial startup, the water paths must be sanitized
with DENTOSEPT P as described in the instructions
for Care and Maintenance by the Practice Team.
– If the customer needs the workstation for patients
within a week, you as the installation engineer
have to initiate sanitization.
– If the customer does not need the workstation for
patients until later, the customer has to sanitize
the water system one day before using the
workstation.
5. Technical documents
– Keep the COPY FOR THE CUSTOMER of the
"Installation report/warranty passport"
document with the other technical documents.
– A transparent folder is enclosed for keeping the
operating instructions supplied with the dental
instruments.
59 06 602 D 3382
D 3382.031.01.02.02
4.
ATTENTION
The technical documents supplied are an important part of
the delivered unit and thus have to be handed out to the
customer. The technical documents must be kept by the
customer!