2 Checking the Supply Lines

2
Checking the Supply Lines
Supply through the floor
Solder fittings: 3/8" ext. thread
ca. 500mm
Supply through the floor
Unfold the installation template.
Cut out the installation field.
Lay the template over the lead ends on the site and
check the distances of the installation field from the
walls in accordance with the drawing of the practice.
Then check the installation for the following:
1.
The corner valves for air and water may not stand with
their top edge more than 60mm above the upper
surface of the finished floor.
2.
The suction and drain pipes must finish flush with the
upper surface of the floor (permissible deviation: +5
mm).
Internal diameter for both pipes: 36,5 mm.
3.
The electrical cables must overhang at least 500mm.
6
2.
0 – 5 mm
ca. 250mm
ca. 200mm
3/8"
Installation template
Ventilation
Supply above the floor
Supply above the floor
Supply pipe ends, corner valves and leads are routed as
shown (for details see Installation Template).
For the connection, the retrofit kit for installation above
ground 33 17 265 is required.
ATTENTION
Clean out the air and water pipes (metal chips!).
Sirona Dental Systems GmbH
1.
max. 60 mm
min. 500mm
3.
59 06 602 D 3382
D 3382.031.01.02.02