Herunterladen Inhalt Inhalt Diese Seite drucken

Compliance With Standards; Inspection And Maintenance - SFA Saniswift Pro Bedienungs- Und Installationsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 11
supply. If the cord of this device is damaged, it must be replaced
by the manufacturer or its after-sales service in order to avoid any
danger to users.
5. COMMISSIONING
Once the plumbing and electrical connections have been made,
check that the connections are watertight by letting water flow suc-
cessively through each inlet used.
Make sure that the unit is operating correctly by carrying out at least
two start cycles with water to test the system.
6. USE
In the event of power failure, stop all water flow to the ap-
pliances connected to the Saniswift Pro.
WARNING
Hot surface.
Burn Hazards!
 Never touch the surface of the motor housing without
protective equipment.
Limit of use
DANGER
Pressure and temperature limits exceeded.
Leakage of hot or toxic fluid!
 Observe the operating specifications in the documen-
tation.
 A void running the pump with the valve closed.
 Dry running, without pumped fluid, must be avoided.
When in use, observe the following parameters and values:
Parameter
Value
Flow rate
Do not exceed (for all appliances)
80% of the flow rate indicated on the
curve (see attached instructions).
Max. allowed temperature
up to 90 °C when pumped 5 minutes
of the fluid
max.
Max. room temperature
50°C
pH
4-10

7. INSPECTION AND MAINTENANCE

7.1 INSPECTION
The proper running of the wastewater lifting station must be checked
by the user once a month observing at least two starting cycles.
7.2 MAINTENANCE
The lifting station has to be regularly maintained by a qualified per-
son. Intervals should be:
• Every 3 months for lifting stations installed in commercial prem-
ises
• Every 6 months for lifting stations installed in collective buildings
• Once a year for lifting stations installed in individual houses
During maintenance, the following should be done:
a) Check the watertightness of connections by checking pipework to
and from the lifting station
b) Activate the gate valves, check their smooth function and their
watertightness ( grease if necessary)
c) Open and clean up the non return-valve system, check it is func-
tioning correctly
d) Clean up the pumping system and its connections, check the im-
peller and the cutting system (for macerating pumps)
e) Clean up the inside of the collecting tank
f) Visually check the lifting station's electrical control box functions.
Once the checks have been made, restart the lifting station in com-
pliance with the manual instructions to check its proper running.
A report should be issued detailing the checks and any notable
points.
If non-compliances that cannot be solved have been found, the qual-
ified person in charge of the maintenance work has to immediately
inform the lifting station's user.
7.3 MAINTENANCE CONTRACT
It is advised to the users to establish a maintenance contract for
regular maintenance and checking.
8. DISMANTLING
DÉBRANCHER LA STATION AVANT TOUTE INTER-
VENTION !

9. COMPLIANCE WITH STANDARDS

This device complies with EN 12050-2 (Wastewater lifting plants for
faecal-free wastewater) of the Construction Products Regulation
and with the European Low Voltage, Electromagnetic Compatibility
and Machine Directives.
10. GUARANTEE
2 years guarantee as from its date of purchase subject to correct
installation and correct use.
Any damage due to foreign bodies such as cotton, con-
doms, sanitary towels, wet wipes, food, hair, metal, wood
or plastic objects, will not be under guarantee. Solvents,
acids and other chemicals can also cause damage to the
unit, and will invalidate the guarantee.
10
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis