11
36
NOTES
Safety instructions
Note!
Maintenance and repair obligations in accor dance with:
▪
VDI/DVGW 6023 Sheet I
▪
Leafl et 60.07 of the German Bathing Association (Deutsche Gesellschaft für das Badewesen e. V.)
▪
DIN EN 806-5
The intervals for regular maintenance depend on the water quality and frequency of use
(but at least once a year).
!
Note!
For additional necessary local equipotential equalization use copper cable of at least 6 mm².
The following legal regulations must be ob served by the qualifi ed electrician during installation:
▪
DIN VDE 0100 parts 701 and 702
In the event of non-observance, the contractor is liable.
!
Note!
Mandatory connecting cables are to be laid and clamped on site in a thermowell / empty conduit.
▪
The required cable types are specifi ed in the corresponding installation instructions:
Example: J-Y(ST)Y 2x2x0,8 mm
Electrical wiring may only be carried out by a qualifi ed electrician in accordance with DIN VDE 105-100.
!
Note!
Protection class IP68 is only guaranteed if installed correctly.
▪
When connecting, pay attention to the connector marking.
▪
Connect the plug connections completely without tension and dry.
▪
Only apply voltage after checking and assigning the plug connections.
Note!
The mounting kit included in the scope of delivery is for universal use.
▪
Before installation, a suitable substrate must be ensured! The fi xing material must be adapted
to the local conditions.
CONTI Sanitärarmaturen GmbH | Hauptstraße 98 | 35435 Wettenberg | Deutschland | Tel. +49 641 98221 0 | Fax +49 641 98221 50 | info@conti.plus
CONTI Sanitärarmaturen GmbH | Hauptstraße 98 | 35435 Wettenberg | Deutschland | Tel. +49 641 98221 0 | Fax +49 641 98221 50 | info@conti.plus
www.conti.plus | Druckfehler und Irrtümer sowie technische und maßliche Änderungen vorbehalten. | Errors and technical changes remain reserved.
www.conti.plus | Druckfehler und Irrtümer sowie technische und maßliche Änderungen vorbehalten. | Errors and technical changes remain reserved.
maintenance obligation
potential equalization
electrical installation
IP68-Connection
fi xation