Herunterladen Inhalt Inhalt Diese Seite drucken

Potential Equalization; Electrical Installation - Conti+ CNX 64 Montageanleitung

Steuerkasten
Vorschau ausblenden Andere Handbücher für CNX 64:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

11
36
NOTES
Safety instructions
Note!
Maintenance and repair obligations in accor dance with:
VDI/DVGW 6023 Sheet I
Leafl et 60.07 of the German Bathing Association (Deutsche Gesellschaft für das Badewesen e. V.)
DIN EN 806-5
The intervals for regular maintenance depend on the water quality and frequency of use
(but at least once a year).
!
Note!
For additional necessary local equipotential equalization use copper cable of at least 6 mm².
The following legal regulations must be ob served by the qualifi ed electrician during installation:
DIN VDE 0100 parts 701 and 702
In the event of non-observance, the contractor is liable.
!
Note!
Mandatory connecting cables are to be laid and clamped on site in a thermowell / empty conduit.
The required cable types are specifi ed in the corresponding installation instructions:
Example: J-Y(ST)Y 2x2x0,8 mm
Electrical wiring may only be carried out by a qualifi ed electrician in accordance with DIN VDE 105-100.
!
Note!
Protection class IP68 is only guaranteed if installed correctly.
When connecting, pay attention to the connector marking.
Connect the plug connections completely without tension and dry.
Only apply voltage after checking and assigning the plug connections.
Note!
The mounting kit included in the scope of delivery is for universal use.
Before installation, a suitable substrate must be ensured! The fi xing material must be adapted
to the local conditions.
CONTI Sanitärarmaturen GmbH | Hauptstraße 98 | 35435 Wettenberg | Deutschland | Tel. +49 641 98221 0 | Fax +49 641 98221 50 | info@conti.plus
CONTI Sanitärarmaturen GmbH | Hauptstraße 98 | 35435 Wettenberg | Deutschland | Tel. +49 641 98221 0 | Fax +49 641 98221 50 | info@conti.plus
www.conti.plus | Druckfehler und Irrtümer sowie technische und maßliche Änderungen vorbehalten. | Errors and technical changes remain reserved.
www.conti.plus | Druckfehler und Irrtümer sowie technische und maßliche Änderungen vorbehalten. | Errors and technical changes remain reserved.
maintenance obligation

potential equalization

electrical installation

IP68-Connection
fi xation

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cnx 150

Inhaltsverzeichnis