Herunterladen Inhalt Inhalt Diese Seite drucken

Adaptation Of Device To Fl Ux-Cored Welding Wire Without Inert Gas; Insert Welding Wire - Parkside PMSG 200 A1 Bedienungs- Und Sicherheitshinweise Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

MIG welding
Wire diameter in mm x 10 =
gas fl ow in l/min
For example, using 0.8 mm wire, will
give a value of approx. 8 l/min.
 Adaptation of device to
fl ux-cored welding wire
without inert gas.
If you are using fl ux-cored welding wire
with integrated inert gas, then you do
not have to have an external inert gas
supply.
First connect the plug
connector marked with the "-". To
fi x it in place, rotate in a clockwise
direction. If you are in any doubt,
then please contact a professional.
Connect the cable assembly with
direct connection
ate connector. To fi x the connection,
tighten the fi xing ring
wise direction.
Then connect the earth cable
the corresponding connector, marked
with the "+" and to fi x the connec-
tion in place rotate in a clockwise
direction.
 Insert welding wire
Unlock and open the cover of the
wire feed unit
1
release knob upwards.
Unlock the roller unit by turning
the roller mount
(see Fig. F).
Pull the roller mount
(see Fig. F).
Make sure that the end of the
Note:
wire does not come loose and cause the
roll to roll out on its own. The end of the
wire may not be released until during
assembly.
20
GB/CY
with the
32
to the appropri-
10
in a clock-
38
with
4
, by pushing the
anti-clockwise
27
off the shaft
27
Completely unpack the welding wire
reel
, so that it can unrolled with-
15
out diffi culty. Do not release the wire
end yet.
Place the wire reel on the shaft.
Make sure that the roll unwinds on
the side of the
29
(see Fig. G and M).
Place the roll mount
lock it by pressing and turning it
clockwise (see Fig. G).
Undo the adjustment screw
swing it downwards (see Fig. H).
Turn the thrust roller unit
side (see Fig. I).
Loosen the feed roll holder
turning it anti-clockwise and pull it
forwards and off (see Fig. J).
On the top of the feed roll
whether the appropriate wire thick-
ness is indicated. If necessary, the
feed roll
has to be turned over or
18
replaced (see Fig. E). The supplied
welding wire (Ø 1.0 mm) must be
used in the feed roll
ifi ed wire thickness of Ø 1.0 mm.
The welding wire must be positioned
in the upper groove!
Erect the feed roll holder
and screw clockwise direction.
Remove the torch nozzle
pulling and turning it clockwise
(see Fig. K).
Unscrew the welding nozzle
(see Fig. K).
Guide the cable assembly with direct
connection
away from the weld-
10
ing device as straight as possible
(place it on the fl oor).
Take the wire end out of the edge of
the spool (see Fig. L).
Trim the wire end with wire scis-
sors or a diagonal cutter in order to
remove the damaged, bent ends of
the wire (see Fig. L).
The welding wire must be kept
Note:
under tension the entire time in order
wire feed guide
back on and
27
and
25
to the
26
by
28
, check
18
with the spec-
18
again
28
by
7
14

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis