Fault cause
No gas flow.

MAINTENANCE

Upon proper ASSEMBLY and OPERATION, the product is maintenance-free.

RESTORATION

If the actions described in TROUBLESHOOTING do not lead to a proper restart and if there is
no dimensioning problem, the product must be sent to the manufacturer to be checked. Our
warranty does not apply in cases of unauthorised interference.

SHUT-DOWN

Close the gas supply and then the shut-off fittings of the connected consumer equipment.
When the LPG system is not in use, all valves must remain closed.
Close all free connections in the feed lines of the LPG system tightly with a
suitable cap to prevent gas from flowing out.

REPLACEMENT

If there is any sign of wear or if the product or parts thereof are damaged, it must be replaced.
When the product has been replaced, observe the steps ASSEMBLY, LEAK TESTING and
START-UP.
To ensure that the installation works faultlessly under normal operating conditions, it is
recommended that you replace the device within 10 years of the date of manufacture.
Product damaged due to flooding!
This causes corrosion and malfunctions to the pressure regulator.
Replace the pressure regulator following flooding!
The gasket in the inlet connector (if provided) must be changed every time the cylinder has
been replaced or disassembled. It must also be replaced if it is damaged or the connection is
no longer tight.

DISPOSAL

To protect the environment, our products may not be disposed of along with
household waste.
The product must be disposed of via a local collection station or a recycling station.
Artikel-Nr. 01 150 50 f
Action
Gas supply is closed:
 open the gas cylinder valve, shut-off fittings, or excess
flow valve EFV.
The thermal shut-out device „T" (TAE) has responded:
 replace the pressure regulator.
The excess flow valve EFV has responded:
 check the entire LPG system for leak,s
 upon completion of leak testing, you can put the
pressure regulator into service again.
Filter screen in the inlet connection is dirty:
 send the pressure regulator to the manufacturer to be
checked.
EN61-DS PS 16 bar
19 / 50

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis