CAUTION! The fermenting coil plug prevents ingress of insects into the
charge.
3.3.2.
DISTILLATION PROCESS
PARTS LIST/INSTALLATION
1 – Kettle
3 – Safety latches
5 – Cooling tower
Release the safety latches and compression couplings of the kettle (3,
24) to install the distillation process components.
Attach the levelling shims (20) to the secondary sieve bottom (12).
10 – Kettle lid
11 – Silicone hose
12 – Secondary sieve bottom
20 – Secondary bottom levelling
shim
21 – Filtering bag
22 – Gasket
24 – Compression
coupling