8 | Installation and electrical connection
8.8
Initial start-up
8.8.1
Safety check
EN
Document the results of the checks and measurements carried
out during initial start-up corresponding to the applicable in-
stallation requirements and standards.
The Webasto Charger Setup app supports you with checks dur-
ing initial start-up.
The local regulations relating to operation, installation and en-
vironmental protection also apply.
8.8.2
Start-up procedure
1.
Remove material residues from the connection area.
2.
Check that every screw is correctly tightened and every
clamp is correctly engaged.
3.
Fit the lower cover.
4.
Secure the bottom cover with the mounting screws; care-
fully tighten the mounting screws to the stop. See Fig. 5.
5.
Switch on power supply.
– Start sequence is activated (duration up to 60 seconds).
– White chase light running up and down. See Fig. 11, op-
erating status N2.
Fig. 11
1.
Check initial start-up and record the measured values in the
test log. The Webasto Charger Setup app can support you
in carrying out and documenting this. An EV simulator is
used for the measurement at the charging coupling.
2.
Simulate and test the individual operating and protection
functions with the EV simulator.
3.
Connect the charging cable to the vehicle.
– The LED changes from green (N3) to pulsing blue (N4).
See Fig. 15.
36 / 45
WEM000062A
5111232B OI-II Webasto Next DE-EN