Herunterladen Inhalt Inhalt Diese Seite drucken

Athena GET 2ND INJ. KIT Installationsanleitungen Seite 4

Suzuki rm-z 250 2016-2018
Vorschau ausblenden Andere Handbücher für GET 2ND INJ. KIT:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18
D. 2nd INJECTOR KIT INSTALLATION
1.
Place the second injector support fixing bracket inside
the manifold by aligning it to the holes previously milled.
Place the second injector support bracket outside the
manifold and align it to the second injector support fixing
bracket. Seal the manifold surfaces with silicone paste.
We suggest applying Athena's Athesil RTV silicone sealant
(not included in the box).
2.
Install and fix GET
second injector and GET
fuel rail, both included
in the kit, on the second
injector support with
the supplied screws and
washers.
3.
Re-install the manifold, which is now equipped with
GET second injector.
4.
Connect the OEM
injector coupling on hose
A to OEM injector.
EN
Inside
Outside
A
To OEM injector
6
5.
Connect the end of
hose B to the fuel rail
B
fixing it with a hose
clamp. Install the hose
by passing it on the right
side of the bike, next to
the condenser.
gk-inj2-0014
6.
Remove
the
protective cap from the
"INJ2" GET ECU connector
and plug it to the female
second injector harness
connector.
7.
Plug
the
male
connector of the second
injector harness to the
second injector.
ATTENTION:
Install the fuel hose and the second injector
harness in such a way as to prevent them from
colliding with the chain, the rear shock absorber,
and the exhaust. Pay attention to cutting edges.
7
Second
GET
injector
harness
ECU
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis