6.
OPERATING INFORMATIONS
6.1.
MACHINE PREPARATION
Before starting to work, wear non-slip shoes,
gloves and any other personal protection device indi-
cated by the supplier of the detergent used or consid-
ered necessary based on the operating environment.
☞ Do the following checks before starting to work.
Refer to the relative sections for a detailed description
of these steps:
Check the battery charge level and charge the battery
if necessary (see 7.2).
Assemble the brush or pad driver (with the abrasive
pad) that are suitable for the surface and work in-
volved (see 7.3).
Assemble the squeegee, check that it is solidly at-
tached and connected to the suction hose and that
the drying blades are not too worn (see 7.5).
Fill the detergent solution tank with a mix of clean water
and non-foaming detergent in an adequate concentra-
tion through the anterior hole. Leave 2 cm between the
mouth of the plug and the level of the liquid (see 7.9).
☞ To avoid risks, become familiar with the machine
movements, carrying out test runs on a large surface
without obstacles.
To obtain the best results in terms of cleaning and
equipment service life, you should do the following
simple but important operations:
- Identify the work area, moving all possible obsta-
cles out of the way; if the surface is very extensive,
work in contiguous and parallel rectangular areas.
- Choose a straight work trajectory and begin work-
ing from the farthest area to avoid passing over
areas that have already been cleaned.
6.1.1. LANGUAGE CONFIGURATION
Photo 6. Keep A and B pressed and turn the power
on key. When "calibration" is displayed press F too.
Release all the buttons. Press C+ or C- to select "lan-
guage" and press F to confirm.
In the main menu select "exit" and press F to confirm.
6.2.

BATTERY CHARGING

Connect the patch cord to the power cable of the bat-
tery charger ( Photo 15 - A ) and to the mains power.
When switching on, the battery charger CBHD1 will
check the battery voltage and decide whether to start
the charging process. If the battery is not connected
to the battery charger, the red LED will flash
( Photo 14 - A ). If the result of the test is positive after
1 second the charging of the battery can start, with
the red LED on.
The progress of the charging process is shown by
three LED's: red, yellow and green, as in the whole
range of the battery chargers.
The green LED ( Photo 14 - C ) shows the end of the
charging. Disconnect the battery charger from the
mains power.
• For further information refer to the use and safety
manual of the battery charger provided by the ma-
nufacturer.
If the machine is equipped with Pb-Acid batteries,
charge only in a well-ventilated area, remove the re-
covery tank and open the battery plugs.
Follow the steps indicated in the battery manufac-
turer's operating and safety manual (see the battery
maintenance section).
Use an hydrometer to check the element liquid inten-
sity on a regular basis: if one or more elements are dis-
charged and the others fully charged, the battery has
been damaged and should be replaced or repaired
(refer to the battery service manual).
A
LED
ROSSO
Photo 14
Photo 15
A) On-board battery charger
B) Battery charger power supply cable
C) Squeegee lifting/lowering lever