Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Electrical Terminals - flamco meibes MeiTronic LFC Montage- Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Installation

Electrical Terminals

Low voltage
max. 24 VAC/DC
Terminal:
Connection for:
-
GND bridge on the lower ground terminal block
S1
Temperature sensor 1 (flow)
S2
Temperature sensor 2 (return flow)
S3
Temperature sensor 3 (optionally)
S4
Temperature sensor 4 (outdoor sensor)
S5
Diff. pressure sensor
V1
0-10 V/PWM signal output
V2
0-10 V/PWM signal output
V3
0-10 V
+ Terminal/
Max. load from external devices 24 V/6 W
voltage output
The connection of the ground wire is made on the lower gray ter-
minal block.
On the control board
CAN
CAN bus connection (1=high, 2=low)
CAN
CAN bus connection (1=high, 2=low)
Mains voltages
230 VAC 50 - 60 Hz
Terminal:
Connection for:
N
Neutral N
L
Mains phase L
L'
230 VAC Power Supply for
0-10 V/PWM pumps
R1
Relay 1
R2
Relay 2
R3i/R3
Relay 3i/R3 (potential-free contact)
The neutral conductor N must be connected to the N ter-
minal block.
The PE protective conductor must be connected to the
PE metal terminal block!
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis