Herunterladen Inhalt Inhalt Diese Seite drucken

Base Station; Fastening The Base Station; Storing And Charging In The Base Station - Silvercrest SHAZB 29.6 B2 Bedienungsanleitung

Akku-staubsauger
Vorschau ausblenden Andere Handbücher für SHAZB 29.6 B2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4

5. Base station

5.1
Fastening the base
station
Fasten the base station 26 to the wall using
the drilling template and the fixing material
included in the delivery.
NOTE: before fastening, check that the fix-
ing material included in the delivery meets
your requirements (e.g. wall structure). If not,
replace it with suitable fixing material.
1. Look for a place on the wall for the base
station 26. Make sure that there is a
wall socket nearby.
2. Using the drilling template, draw the
marking for the drill holes on the wall.
3. Drill holes with a diameter of 6 mm us-
ing a drill.
4. Insert the rawlplugs into the drill holes.
5. Tighten the screws in the rawlplugs.
6. Hang the base station 26 up on the
wall and check for a secure hold.
28 GB
5.2
The base station 26 is used as a holder and
battery charger for the suction device 2 with
the suction pipe 32, the brush nozzle 43
and the crevice nozzle 44. After every use,
hang the suction device 2 up in the base sta-
tion 26.
 26
Storing and charging in
the base station
 23
 26
 27
 26
 27
 2
 32
• Hang the suction de-
vice 2 with the re-
cess between the
charging contacts 5
on the hook 23 of the
base station 26.
• The battery 29 will
be charged automati-
cally.
• The suction pipe 32
remains attached to
the suction device 2.
• The crevice nozzle 44
and the brush noz-
zle 43 can be
plugged onto the
holders 27.
• The floorhead 35
can stay connected to
the suction pipe 32.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis