Herunterladen Inhalt Inhalt Diese Seite drucken

Items Supplied; The Base Station; Fastening The Base Station - Silvercrest SHAZ 22.2 A1 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für SHAZ 22.2 A1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

__CPE284657_Staubsauger_B1.book Seite 59 Montag, 12. Dezember 2016 8:05 20

4. Items supplied

1 suction device 5 with dust container 10
1 base station 25
1 power adapter 30
1 battery 32
1 suction pipe 19
1 floorhead 21
1 small brush nozzle 33
1 medium brush nozzle 34
1 large brush nozzle (rotatable) 35
1 small nozzle (short) 36
1 small nozzle (long) 37
1 large nozzle 38
1 adapter 39 for the small and medium
brush nozzle and small nozzles
1 adapter 40 for the large brush nozzle
1 elbow adapter 41 for the small and me-
dium brush nozzle and small nozzles
2 extensions 42 for the small and medium
brush nozzle and small nozzles
1 drilling template
1 set of fixing material (2 rawlplugs,
2 screws)
1 copy of the user instructions

5. The base station

5.1 Fastening the base sta-
tion
25
Fasten the base station 25 to the wall using
the drilling template and the fixing material
included in the delivery.
NOTE:
Before fastening, check that the fixing
material included in the delivery meets
your requirements (e.g. wall structure).
If not, replace it with suitable fixing ma-
terial.
1. Look for a place on the wall for the base
station 25. Make sure that there is a
wall socket nearby.
2. Using the drilling template, draw the
marking for the drill holes on the wall.
3. Drill holes with a diameter of 6 mm us-
ing a drill.
4. Insert the rawlplugs into the drill holes.
5. Tighten the screws in the rawlplugs.
6. Hang the base station 25 up on the
wall and check for a secure hold.
59
GB

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis