Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Control Panel - Comprag DV Serie Bedienungsanleitung

Schraubenkompressoren
Vorschau ausblenden Andere Handbücher für DV Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Remove the left side panel, pass the cable under the compressor into the orifice (1) and
gland (2).
Connect the power supply cables to the terminal 4. The earth wire of the power cable must be
connected to the corresponding earthing bolt 3.
4.

Operation

4.1 Control panel

The frequency-controlled compressors DV11 and DV22 are equipped with an electronic
v-Log
control. The electronic
programmable limit values by automatically adjusting the compressor speed. Operating data
such as operating times and system statuses are also recorded.
16
Non-qualified personnel must not be allowed to operate the com-
pressor.
v-Log
control maintains the network pressure between the
cable
Version 1.0

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis