Herunterladen Inhalt Inhalt Diese Seite drucken

Start Up; Lifting And Carrying - Comprag DV Serie Bedienungsanleitung

Schraubenkompressoren
Vorschau ausblenden Andere Handbücher für DV Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Main components
К1---К4
Contactor
М1, М2
Electric motor
Т
Temperature sensor
I/P
Pressure sensor
SB
Emergency stop
F1, F2
Fuses
2.7 General description
Voltage (V)
380 / 400
380 / 400
3.

Start up

3.1 Lifting and carrying

12
Frequency (Hz)
Мaterial - copper. Cable size (mm²)
50
50
All lifting should be carried out using a forklift truck with a carrying ca-
pacity suited to the compressor. Lifting may be carried out with loading
cranes, winches and other machinery, using a crossbeam with the
right length. Local safety guidelines for lifting have to be observed.
G
A
YA
QS
CT1, CT2
R,C
Tr
v-Log
DV11..
DV15..
6
Fuse value (A)
35
50
B
D
C
Solenoid valve
Automatic power switch
Current Transformer
RC elements
Transformer
Controller
DV18..
6
10
63
For transport with a forklift
truck, use the rigging holes
in the frame. The compressor
has slotted rigging holes with
width C – fig. 3.1. Move the
compressor carefully.
Fig. 3.1 Lifting and carrying
DV11 – DV22
DV22..
16
63
Version 1.0

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis