Herunterladen Inhalt Inhalt Diese Seite drucken

ATH-Heinl Cross Lift 50+ Bedienungsanleitung Seite 97

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
5. Electrical connection
a. Lay all electrical cables between the control box and the lift
and connect them in accordance with the numbering or connectors.
b. The limit switches for the lift are only electrically connected at this stage. Please install them
on the platform later.
General and local regulations must be observed. Therefore, these steps may only be carried out by
a trained professional with the relevant local licence/approval.
Pay attention to the necessary supply line (see technical data).
You will find the associated circuit diagram in Appendix 6.2 of these operating instructions.
6. Bleeding the hydraulic circulation
See the instructions in the Final Tasks section.
Important!
Before the system is put into operation or operated with oil for the first time, the following
must be observed with regard to optimal, trouble-free and virtually air-free functioning.
-
Use the prescribed hydraulic oil (see Technical Data)
-
All hydraulic lines must be connected and tightened according to the hydraulic plan and, if
applicable, according to the hose designation!
-
A minimum quantity of 20 litres of oil is required! Use caution when filling for the first time!
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 31 -

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis