Herunterladen Inhalt Inhalt Diese Seite drucken

Sentiotec IKI Monolith Montage- Und Gebrauchsanweisung Seite 38

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Instructions for installation and use
14. Piling of the stones
Use protective gloves when piling the stones to the heater because there may
be sharp edges in the heater.
If needed wash the stones before you pile them. You can fit about 120 kg of
stones to the heater.
Piling the stones should be done with care. The stones should be placed so that
the gap between the heating elements and the frame of the heater is completely
filled with stones for the whole height of the heater. The stones should not be
placed too tightly together; instead there should be enough space between the
stones to allow air to flow freely.
In private use, we recommend olivine diabase stones, 5 - 10 cm (Item.-no.: R-990)
The stones should be smaller than 10 cm in diameter, so that they are easy to
pile in between the heating elements and the mesh frame. In ordinary use the
stones should be changed every 2 to 5 years, depending on how frequently the
sauna is used.
One of the sides of
the heater opens up.
Lift the side away
WORLD OF WELLNESS
Pile the stones
halfway up.
Lift the piece
back.
p. 16/22
Pile rest of
the stones.

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis