(2) Temporarily fasten the connection cable along the connection pipe with vinyl tape.
(Wrap to about 1/3 the width of the tape from the bottom of the pipe so that water
does not enter.)
Wall pipe
(3) Securely fasten the EV kit cable to the indoor unit pipe.
(4) Conceal the tube protecting the EV kit connector with the product, etc., so that the
customer cannot access it.
(5) Fasten the connection pipe to the outside wall with saddles, etc.
Pipe
(6) Fill the gap between the outside wall pipe hole and the pipe with sealer so that rain
water and wind cannot blow in.
(7) Install the front panel.
• First fi t the lower part of the front panel, and insert top and bottom hooks. (3 top
sides, 6 bottom sides)
Indoor unit
Top holes (2 sides)
Top hole (Center)
Indoor unit
• Attach the 4 screws.
(8) Install the intake grille.
• The fi xing axle of the intake grille is installed on the Panel.
• Lay down the intake grille.
(9) Fasten the drain hose to the outside wall, etc.
Check the condition of the drain hose and make sure that it is routed correctly.
GOOD
Make sure the drain water is properly drained.
9377773098-01_IM.indb 14
9377773098-01_IM.indb 14
Downloaded from
www.Manualslib.com
Power supply cable
Connection cable –
Transmission cable
EV kit cable
Connection pipe
Drain hose
Outside wall cap*
Saddle*
Sealer putty*
Wall
(Outdoors)
*Field supply
Bottom hooks
(6 position)
Bottom hole
Front panel
(6 position)
Top hook (Center)
Front panel
Top hooks (2 sides)
PROHIBITED
Drain
hose
Saddle
Lifted up
Wave
CAUTION
manuals search engine

8. TEST RUN

8.1. Test run using Outdoor unit (PCB)

• Refer to the Installation Manual for the outdoor unit if the PCB for the outdoor unit is to
be used for the test run.

8.2. Test run using Remote Controller

• Refer to the Installation Manual for the remote controller to perform the test run using
the remote controller.
• When the air conditioner is being test run, the OPERATION and TIMER indicator lamps
fl ash slowly at the same time.

9. CHECK LIST

Pay special attention to the check items below when installing the indoor unit(s). After instal-
lation is complete, be sure to check the following check items again.
CHECK ITEMS
Has the indoor unit been installed
correctly?
Has there been a check for gas leaks
(refrigerant pipes)?
Has heat insulation work been
completed?
Does water drain easily from the indoor
units?
Is the voltage of the power source the
same as that indicated on the label on
the indoor unit?
Are the wires and pipes all connected
completely?
Is the indoor unit earthed (grounded)?
Is the connection cable the specified
thickness?
Are the inlets and outlets free of any
obstacles?
Does start and stop air conditioner
operation by remote control unit or
external device?
After installation is completed, has the
proper operation and handling been
explained to the user?
Is the EV kit connected?
End in water
CHECK
If not performed correctly
BOX
Vibration, noise, indoor unit may
drop
No cooling, No heating
Water leakage
Water leakage
No operation, heat or burn
damage
No operation, heat or burn
damage
Short circuit
No operation, heat or burn
damage
No cooling, No heating
No operation
No cooling, No heating
En-14