Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Control Unit; Finishing - Fujitsu AIRSTAGE ASYE07GACH Installationsanleitung

Vorschau ausblenden Andere Handbücher für AIRSTAGE ASYE07GACH:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18
CNA01
CNA02
CNA04
CNA03
To EV kit

6.7. Installing the control unit

• Refer to 6.1 (1) to (5) to install the control unit, thermistor, and earthing (grounding) wire.
(1) Connect the connection cable.
L, N: Power
supply cable
Power supply
earth (ground)
cable
EV kit earth
(ground) cable
Earth (ground)
terminal for wired
remote controller
(if necessary)
EV kit cable
After connecting the EV kit cable, slide the tube (included with
the EV kit) over the connector to protect it.
Tube
Do not route the cables over the screw hole.
GOOD
Cable
When you attach the cable clamp, make sure that the cables are not jutting out from the
clamp or being pinched by the clamp.
En-13
9377773098-01_IM.indb 13
9377773098-01_IM.indb 13
Downloaded from
www.Manualslib.com
CNB01
Cable tie
(Accessories)
Connect
Cable tie (Small)
Connect
PROHIBITED
Cable
Screw hole
manuals search engine
(2) Install the cable clamp.
10 mm
or less

7. FINISHING

After completing the refrigerant leak check (for details, refer to the Installation Manual of
the outdoor unit), install the insulation.
(1) Insulate between pipes.
• For rear, right, and bottom piping, overlap the connection pipe heat insulation and
indoor unit pipe heat insulation and bind them with vinyl tape so that there is no
gap.
• For left and left rear piping, butt the connection pipe heat insulation and indoor unit
pipe heat insulation together and bind them with and vinyl tape so that there is no
gap.
Connection pipe
(Heat insulation)
Bind the pipes together so that
X1, X2:
there is no gap.
Transmission
cable
Seal A is used when the diameter
of gas pipe is 1/2 inch or more.
Butt connection pipe (heat insulation) against the indoor unit pipe (heat insulation)
and wrap with seal A so that there is no gap.
• For left and left rear piping, wrap the area which accommodates the rear piping
housing section with cloth tape.
• For left and left rear piping, bind the connection cable to the top of the pipe with
vinyl tape.
• For left and left rear piping, bundle the piping and drain hose together by wrapping
them with cloth tape over the range within which they fi t into the rear piping housing
section.
Screw hole
Cable clamp
Screw
Overlap the insulation
Indoor unit pipe
(Heat insulation)
Vinyl tape
Pipe
Wrap with cloth tape
Drain hose
Cloth tape
7/12/2012 3:05:26 PM
7/12/2012 3:05:26 PM

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis