Herunterladen Inhalt Inhalt Diese Seite drucken

Mettler Toledo Excellence Referenzhandbuch Seite 11

Analysenwaagen
Vorschau ausblenden Andere Handbücher für Excellence:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21
4.2.1 Installing Antistatic Kit
§
Balance is switched off.
§
Balance is disconnected from the power supply.
1 Remove the relevant side door (1).
2 Remove the any of the 3 clips, for example the
middle one (2).
3 Push the compact ionizer in from back to front
until it clicks into place. If necessary, gently
squeeze the strips at the back.
4 Insert the side door (3) marked with "Conducting
Glass" (4) at an angle of approx. 30° into the two
slots.
5 Lift the side door against the balance until it clicks
into place.
6 Push the side door completely to the front.
7 Check that the side door runs easily, otherwise it
is not correctly inserted.
8 For XPE balances, return the handle to the upright
position.
For XSE balances, clip the handle together.
9 Plug the power connection (5) into the socket for
AC adapter.
10 Plug the control cable (6) into Aux 1 or Aux 2.
11 Plug the power supply cable (7) into the ionizer.
12 Connect the AC adapter (8) to the power supply.
Compact Antistatic Kit
1
2
3
4
6
8
7
Installation and Putting into Operation​ ​ 7
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis