Herunterladen Inhalt Inhalt Diese Seite drucken

Kessel 28 560 Anleitung Für Einbau, Bedienung Und Wartung Seite 18

Minilift
Vorschau ausblenden Andere Handbücher für 28 560:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
9. Making sure that these inlets will not
affect the function of the pump's float
switch.
10. Insert and glue the outgoing pressure
pipe (DN 40) (according to DIN 8063)
inside the outlet portion of the Minilift
(#7 & #6) (glue is supplied). Make sure
that the outgoing pressure pipe is se-
curely installed.
CAUTION – Before pouring concrete,
make sure to protect the solid cover (#2)
and grated cover (#11) with a foil or plastic
wrap so that these pieces stay clean.
11. After all conduit and drainage pipe
connections have been properly made
pour concrete around Minilift and se-
cure in place.
11. If deeper installations are necessary,
KESSEL extension section (Article
#32500) can be used. Seal between
the extension section and the Minilift
chamber takes place on site.
3. Installation
1.
Chamber
2.
Cover and grate
3.
Pump
4.
Pump outlet
5.
Locking lever
6.
Quick release mechanism
7.
Locking nut
8.
Flat gasket
9.
Rubber seal
10. O-ring
11. Grated cover
12. Pump power cable
13. DN 50 hole
14. Float switch
15. Suction basket
16. Float switch adjustment
17. Back flow flap
18

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis