4. Place the o-ring (3) on the top of the filtertank and insert the 7-way valve (2). Insert the clamp-
ing ring (4) and tighten the fastening screws (figure. 5 and 6).
5. The pressure gauge (if included) is screwed to the side of the 7-way valve and sealed with tef-
lon tape. The existing vent plug should be removed first (figure 7).
6. The pump (1) must be positioned on its special seat on the supporting base (10) and fixed to
the base with the screws it is equipped with (figure 8).
MV-1080-09-2016 . Swim & Fun Scandinavia . info@swim-fun.dk . www.swim-fun.com
© All rights reserved Swim & Fun Scandinavia ApS 2016
Figure 5
Figure 7
Figure 8
Figure 6
Page 35