Central ventilation units AIR1 RH
5 .0

Service and maintenance

The filter change is usually carried out by the user. Additional cleaning and maintenance work may only be carried out
by an electrician.
m
Danger to life!
The unit must be fully isolated from the mains power supply before all maintenance and installation work and
opening the terminal compartment!
Danger of electric shock, moving parts (fan) and hot surfaces .
5 .1

Maintenance plan

The unit must be fully isolated from the mains power supply before all maintenance and installation work and
opening the terminal compartment! The electrical connections must be carried out in accordance with the
relevant wiring diagram and must only be carried out by qualified electricians . The electrical connection must
be fully isolated until the final assembly!
The unit must be regularly inspected for the subsections in the following maintenance plan:
Art . Activity
1
Outside air and exhaust air outlets
1.1
Check for contamination, damage
and corrosion
2
Air filters
2.1
Check for unacceptable conta-
mination and damage (leaks) and
odours
3
Air ducts
3.1
Check accessible air duct sec-
tions for damage
3.2
Check two or three representative
locations on inner air duct surface
for contamination, corrosion and
condensation
4
Fan
4.1
Check for contamination, damage
and corrosion
5
Heat exchanger (incl . rotary heat exchanger)
5.1
Visual inspection of rotary heat
exchanger for contamination,
damage and corrosion
5.2
Heating register (optional): Check
for contamination, damage, cor-
rosion and seal tightness
5.3
Cooling register (optional): Check
register, droplet separator and
condensate tray for contaminati-
on, damage, corrosion and seal
tightness
6
Housing
6.1
Check for unacceptable conta-
mination and damage (leaks) and
odours
5 .2

Service and maintenance of rotary heat exchanger

m
Danger to life!
The unit must be fully isolated from the mains power supply before all maintenance and installation work and
opening the terminal compartment!
Danger of electric shock, moving parts (fan) and hot surfaces .
m
Risk of injury due to high unit weight!
Heat exchangers are very heavy and can contain condensate water.
Two people are required for dismantling the unit (AIR1 RH 1500, 2000).
– Use a forklift to transport the heat exchanger for unit types AIR1 RH 3000, 5000, 6000, 8000, 9500, 12000, 5000.
– With regard to models AIR1 RH 5000, 6000, 8000, 9500, 12000, 15000, the power supply must be disconnected
and the main switch must be removed before dismantling the service panels of the rotary heat exchanger.
Measure (if required)
Clean and repair
Replace affected air filters
Repair
Inspect duct system in
other locations, decide on
cleaning requirement (not
just visible section!)
Clean and repair
Clean, repair
Clean and repair
Clean and repair
Clean and repair
70
3
6
12
months
months
months
months
X
X
X
X
X
X
X
X
X
24