Herunterladen Inhalt Inhalt Diese Seite drucken

Fronius Primo serie Serviceanleitung, Ersatzteilliste Seite 141

Netzgekoppelter wechselrichter
Vorschau ausblenden Andere Handbücher für Primo serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

(9)
(6)
(5)
(5)
(2)
(5)
(3)
IMPORTANT! When installing the new PC
board, ensure that the heat transfer paste
on the modules (9) is not scratched or re-
moved.
Position the new PC board on the heat
3
sink
NOTE! To avoid creating mechan-
ical stresses, the screws should
first be tightened to 0.5 Nm then
subsequently to 2.0 Nm.
Screw the module onto the heat sink
4
with 4 x 4x9 mm TX20 screws (6).
Tightening torque = 0.5 Nm
Tighten the 4x 4x9 mm TX20 screws
5
(6) to 2.0 Nm.
Fix the PrimoPS PC board with 14 x
6
4x9 mm TX20 screws (5)
Tightening torque = 2 Nm.
Reattach all cables (2)–(4) to the Pri-
7
moPS.
(5)
(4) (5)
141

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis