(3)(4)
Final Tasks
1
2
3
4
5
6
7
8
(5)
(1)
(2)
Check that the sealing plug is not leaking
Attach the power module cover
Insert the device into the wall bracket and tighten screws
If applicable connect the data communication lines
Attach the DATCOM cover
Reconnect the AC power supply
Set the DC disconnector to ON
After commissioning the inverter, start a fan test via the display (see operating instruc-
tions)
Replace the fan holder (5), making
11
sure that the locking devices (4) enga-
ge.
Fix the fan holder (5) with 2 X 5x14 mm
12
TX25 screws(3)
Tightening torque = 2.15 Nm
(4)
(3)
Carefully turn the inverter round
13
Connect the Molex plug (1)
14
Insert the cable into the clamping nose
15
129