* At temperatures below 4 °C, the use of SAE 30 oil will make it difficult
to start the engine
** At temperatures above 27 °C, the use of a 10W-30 oil can lead to higher
oil consumption.
Check the oil level more frequently
5.4.

Preparations for initial commissioning

The power generator is delivered without engine oil. Never start the engine without engine oil.
Damage caused by operating the engine without oil cannot be repaired and is not covered by the
We recommend that the oil level is checked at least twice a day during the running-in phase
(approx. 200 operating hours). After the running-in phase it is sufficient to check it once a day.
Fill the engine with oil.
For this, refer to the operating manual of the engine manufacturer.
Check the oil level.
This procedure is described in Chapter „5.5.2. Checking the oil level in the engine" on Page
28.
Connect the battery.
This procedure is described in Chapter „5.10. Installing and removing the battery" on Page 33.
Fill with fuel.
This procedure is described in Chapter „5.5.4. Filling with fuel (integral tank)" on Page 29.
SStart the power generator.
This procedure is described in Chapter „5.6.1. Starting" on Page 31.
Perform a 10-minute test run.
Operate the power generator without load.
Check the engine for leaks during and after the test run.
Switch the engine off.