Herunterladen Inhalt Inhalt Diese Seite drucken

Operation Of The Power Generator; Transportation Of The Power Generator; Transport By Crane Or Lift Truck; Transport By Hand - Eisemann BSKA 14 EV RSS cube Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.

OPERATION OF THE POWER GENERATOR

5.1.

Transportation of the power generator

Requirement for transportation:
Power generator is switched off and cooled down.
No consumer/cable connected.
Sound enclosure closed.
Pay attention to the weight and dimensions, refer to „3.6. Technical Data" on Page 17.
5.1.1.

Transport by crane or lift truck

S
USpENDED
Risk of serious injuries leading to death
No personnel are allowed to be under or near suspended loads
Lifting gear must be approved for the weight of the power generator
When using industrial trucks, pay attention to the correct centre of gravity
Transport power generators at low lift heights
Secure any accident site and initiate immediate life-saving measures
Local and user-based safety regulations must be observed during transport.
For crane transport: Use only suitable and approved lifting gear!
For industrial truck: Set the power generator onto a suitable flat palette.
5.1.2.

Transport by hand

Danger of crush injuries by falling / slipping power generator.
Provide first aid in accordance with guidelines and/or notify first responders.
Unfold carrying handles (20-4).
Raise the power generator simultaneously.
Slowly carry the power generator to its site of operation.
Page 24
I
WARNING
L
OADS
NOTE
I
CAUTION
Lift only on the carrying handles.
Carry the power generator with at least one person per carrying handle.
Raise the power generator simultaneously / walk slowly
.

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis