Herunterladen Inhalt Inhalt Diese Seite drucken

Jacuzzi CHELSEA Projecta Installation, Bedienung, Wartung Seite 18

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 27
It is advisable to turn the deviator to the "foot nozzle" position.
(please see the chapter on "Electrical Safety").
-
bath is interrupted and the boiler will not be emptied. When the
power is restored, it is advisable to allow the shower enclosure to
power up for at least two minutes.
sures. A considerable difference in pressure may prevent correct and
speedy adjustment of the water temperature.
-
-
-
-
18
18
-

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis