Herunterladen Inhalt Inhalt Diese Seite drucken

Put In Place The Vertical Rod - OMCN Gebrauch und wartung Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
4. Insert again the pin passing through the cylinder
rod and tie rod holes; put back in place the external
elastic ring.
5. Connect the pneumatic lock supply pipe on the
pedal box joint.
1
4.2.4

Put in place the vertical rod

1. Put a hand down on the protection cap (placed on
top of the rod) and press it downwards; with the
other hand remove the steel rod inserted between
the arm and the mounting tool; take off slowly the
hand that was pressing the rod protection cap.
Danger!
The spring could eject violently the rod from
its housing, thus it might be a serious danger
for the operator.
Be careful when carrying out this
operation.
2. Remove the adhesive tape with a cutter.
OMCN spa
Initial commissioning | GRIP F 20 | 27
4.2.5
Mounting of the bead breaking cylinder
1. Remove the external elastic ring and take off the
hinge rod from its housing in the bead breaking arm.
2. Insert the bead breaking arm and centre the joint
pin.
3. Insert the hinge-pin and put back in place the
external elastic ring.
4. Place the buffer spring on the provided tab and
screw in the bead breaking cylinder the self locking
nut.
Danger!
Wrong mounting of the bead breaking
cylinder compromises machine functioning
and can be a serious danger for the operator.
During machine installation be sure that
the nut is correctly screwed in the bead
breaking cylinder rod (at least 10 mm).
en
xxx
|
1 695 108 479
2016-09-26

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis