Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Commissioning; Unpacking; Cover Removal - OMCN Gebrauch und wartung Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
en
26 | GRIP F 20 | Initial commissioning
4.

Initial commissioning

4.1

Unpacking

1. Remove the iron tape and the fixing clamps from the
pallet and the packaging cardboard.
i
After unpacking check the integrity of GRIP F 20
and check that no components are visibly damaged.
In case of doubt do not proceed to start-up and
contact a qualified technician and/or your vendor.
2. Take out of the transport crate the standard
accessories and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.2
Assembly
4.2.1

Cover removal

1. Unscrew the 4 screws of the side cover and remove
the cover itself.
4.2.2
Lifting of the tilting column
1. Unscrew the fulcrum-pin screw of the column with
the hex key 6 and remove the pin.
|
1 695 108 479
2016-09-26
2. Get a 1 Mt lifting sling, DR 50 model (safety factor
6:1); wrap the sling around the tilting column (1),
extend the bead breaking arm and lift the column
with a hoist (2).
2
1
3. Remove the external elastic ring with appropriate
pliers and take off the pin.
4.2.3
Column fixing
1. Align the cylinder rod and the tie rod holes.
2. Insert the air tube in the slot in the machine box.
3. Fix the column to the cylinder tank by inserting
the pin with a hammer and tighten the fulcrum-pin
screw.
OMCN spa

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für OMCN Gebrauch und wartung

Inhaltsverzeichnis