Herunterladen Inhalt Inhalt Diese Seite drucken

Mechanical Installation; Important Precautions During Installation - HBM FIT7A Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für FIT7A:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mechanical installation

4
Mechanical installation
12
4.1
Important precautions during
installation
S Handle the transducer with care.
S Welding currents must not be allowed to flow over the
transducer. If there is a risk that this might happen,
you must provide a suitable low-ohm connection to
electrically bypass the transducer. HBM provides the
highly flexible EEK ground cable for this purpose, for
example, that is screwed on above and below the
transducer.
S Make sure that the transducer cannot be overloaded.
WARNING
There is a danger of the transducer breaking if it is over­
loaded. This can cause danger for the operating person­
nel of the system in which the transducer is installed.
Implement appropriate safety measures to avoid
overloads or to protect against the resulting dangers.
Notice
Load cells are precision measuring elements and need to
be handled carefully. Dropping or knocking the trans­
ducer may cause permanent damage. Make sure that the
transducer cannot be overloaded, including while it is
being mounted.
A3924-1.1 HBM: public
®
FIT
7A

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis