Herunterladen Inhalt Inhalt Diese Seite drucken

Mechanical Installation; Important Precautions During Installation; General Installation Guidelines - HBM Z30A Montageanleitung

Vorschau ausblenden Andere Handbücher für Z30A:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mechanical installation

7
Mechanical installation
7.1

Important precautions during installation

S treat the transducer gently
S if measuring compressive forces, make sure there is a solid support
structure
S the force‐introduction surfaces must be scrupulously clean and fully
load‐bearing
S keep to the depths of engagement for threaded rods or knuckle eyes
S do not overload the transducer.
WARNING
If there is a risk of breakage through overload on the transducer and thus a risk
to persons, additional safety measures are to be taken.
7.2

General installation guidelines

The measurement direction in which forces act on the transducer must be as
precise as possible.
WARNING
Torsion and bending moments, eccentric loading and transverse forces result
in measurement errors and if limit values are exceeded, could destroy the
transducer.
10
A02076_01_X00_01 HBM: public
Z30A

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis