Herunterladen Inhalt Inhalt Diese Seite drucken

Version With External Actual Value; Initialisation And Commissioning; Electrical And Pneumatic - Gemü cPos 1436 eco Original Kurzanleitung

Intelligenter stellungsregler
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.1
Version with external actual
value potentiometer (code
S01)
X4
Connection Pin Signal name
UP+, output potentiometer supply
1
voltage (+)
UP, input potentiometer wiper
2
X4
voltage
M12 socket
UP-, output potentiometer supply
3
A coding
voltage (-)
4
n.c.
5
n.c.
5
Initialisation and
commissioning
If the GEMÜ 1436 cPos eco
is delivered fully mounted to
a valve ex works, it is already
preset at the factory (at a control
pressure of 5.5 - 6 bar without
operating pressure) and is
therefore ready for operation. A
reinitialisation (see chapter 5.2)
is recommended if the plant is
operated with a diff erent control
pressure or if the mechanical end
positions have been changed
(e.g. seal replacement on the
valve or actuator replacement).
The initialisation is retained even
in the event of voltage cutoff .
5.1
2
1
3
5
1. Make the connection between pneumatic
4
positioner outlet A1 (single acting) and
the pneumatic actuator control air inlet.
X4
2. Connect the control air supply (additional
air) to the air supply connection P (max. 7
bar) (see chapter 3 "Pneumatic
connections").
3. Switch on the 24V DC power supply (see
chapter 4 "Electrical connections").
+24V DC
15 / 20

Electrical and pneumatic

connection
The symbols are explained in the
operating instructions in chapter
"Display elements".
LED
Symbol
OPEN
$
ERROR
=
GND
4
1
LED
Symbol
CLOSED
$
POWER
G
3
5
2
1436 cPos eco

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis