Herunterladen Diese Seite drucken

Maintenance/Repair - Ottobock 2WR95 Gebrauchsanweisung

Vorschau ausblenden Andere Handbücher für 2WR95:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
Tightening torque 10 Nm (see Fig. 1 )
4) The end of the M5X30 cylinder head screw must be covered with the
included shrink tubing. To do so, cut a suitable piece off at a right angle,
place it over the end of the screw, and use a hot air gun or a small flame
to shrink it until it is sufficiently tight.
6  Maintenance/Repair
INFORMATION
The fundamental design of all Ottobock adapters allows for a possible period
of use of 3 to 5 years, depending on the patient's activity level.
In general, we recommend regular annual safety inspections.
The safety inspections must be performed by a prosthetist.
6.1  Spare parts
Single components
none
Minimum order quantity
none
Single-component pack
4D27 contains:
4 M8x10 corrosion protected set screws
8 M8x12 corrosion protected set screws
8 M8x14 corrosion protected set screws
4 M8x16 corrosion protected set screws
2 M5x22 corrosion protected cylinder head screws
2 rounded washers
1 M5x30 corrosion protected cylinder head screw
1 plastic ring
3 cm shrink tubing
18 | Ottobock

Werbung

loading

Diese Anleitung auch für:

4wr95-3