Herunterladen Diese Seite drucken

Layout; Layout With Hand Pump; Layout With Electric Pump - CEMO KS-Mobil 400l Betriebsanleitung

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

3. Layout

a
d
a Pump cabinet
b Ventilation pipe
c Coupling
d Leakage indicator
e Leakage indicator test valve

3.1 Layout with hand pump

k
m
g
i
n
f Filling opening
g Delivery line ball valve
h Dipstick
i Safety valve
j Limiting value transmitter
k Hand pump
l Hand pump lever
m Outlet manifold
n Delivery hose
b
c
e
l
j
h f
e

3.2 Layout with electric pump

k
m
l
g
i
n
h
f Filling opening
g Delivery line ball
valve
h Dipstick
i Safety valve
j Limiting value
transmitter
Optional: o K33 meter, ATEX
i
Important!
Read and follow the separately enclosed
operating and maintenance instructions
of the pump manufacturer.
3.2.1 Electrical connection of the pump to the
power source by a licensed qualified
electrician in accordance with the Ordinance
on Industrial Safety and Health or the
prevailing national regulations
- insertion of cable into the pump in accordance
with the assembly instructions for cable glands
- connection cable and any plug required are
provided on site
GB
j
f
k Electric pump 12 V,
option 230 V 50 Hz
l Electric pump
switch
m Automatic delivery
nozzle
n Delivery hose
o
21

Werbung

loading

Diese Anleitung auch für:

Ks-mobil 600lKs-mobil 980l