Herunterladen Inhalt Inhalt Diese Seite drucken

Layout; Initial Setup - CEMO Trolley 100l Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Trolley 100l:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3. Layout

Ventilated screw cap
a
Scale for mixing ratio (only caddy 60 l)
b
Crank pump
c
Delivery hose
d
Delivery nozzle
e
Hose holder
f
Delivery nozzle lock
g
Delivery nozzle holder
h
Transport handle
i
Grip hollow
j

4. Initial setup

1. Mount the delivery nozzle on the hose.
Place the delivery nozzle in the holder
and close the lock.
2. Only for trolley 100 l (10600):
Fasten both hose holders to tank using
screws (M6 x 10) (fig. 01).
i
c
e
a
g
h
d
b
3. Place the trolley/caddy in a horizontal position
and remove screw cap a.
Fill the trolley/caddy (see section 5.3).
f
i
Important!
Please use an automatic delivery
nozzle to avoid overflows.
j
4. Close the filling opening with the screw cap.
Place the trolley/caddy upright again.
5. Open the ventilation cap. Wind the pump cw
and dispense some AdBlue
container to clean the system from production
residues. Dispose this AdBlue
6. Open screw cap a again. Vent the system
completely by holding the delivery nozzle in
the filling opening of the trolley/caddy. Wind
until flow is constant and without bubbles.
7. Close ventilation screw in screw cap (fig. 02).
The filling station is now ready for use.
GB
Fig. 01
in a seperate
®
.
®
Ventilation
screw
Screw cap
Fig. 02
9

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Trolley 60l

Inhaltsverzeichnis