other damage until they are ready for installation. Do not, therefore, destroy the packaging; only remove it
when assembly is imminent.
NOTE!
•
Risk of environmental harm through incorrect disposal!
•
Packaging materials are valuable raw materials. In many cases they can be re-used or recycled. Incorrect
EN
disposal of packaging materials can harm the environment.
•
Dispose of packaging materials in an environmentally compatible manner.
•
Observe locally applicable disposal regulations. If necessary, commission a specialist disposal firm.
5.4 STORAGE
Store the packages in the following conditions:
•
Do not store outdoors
•
Store in a dry and dust-free location
•
Do not expose to aggressive media
•
Protect from sunlight radiation
•
Avoid mechanical jolts
•
Storage temperature: 15 to 35 °C
•
Relative humidity: max. 60 %
•
If storing for longer than 3 months, regularly inspect the general condition of all parts and the packaging.
If necessary re-apply or renew the rust-proofing
TIPS AND RECOMMENDATIONS!
•
Some packages may bear labels with storage information that extends beyond these requirements. These
notes should be observed accordingly.
6.
INSTALLATION AND INITIAL START-UP
6.1 SAFETY NOTES FOR INSTALLATION AND INITIAL START-UP
STAFF
Installation and initial start-up of the system may only be performed by qualified staff.
6.2 PREPARATION
UNPACKING
•
The system components should be removed from their packaging carefully and prudently.
•
Additional protective packaging should also be removed.
•
Check all components of damages from transport
DEPRESSURIZE
•
Depressurize components and purge with inert gas if necessary
•
Cut tubing with special tool; avoid contaminations (dirt, cuttings, etc.)
•
Check perfect condition of components and purity of connections
6.3 INSTALLATION
In most cases the shut-off valve is mounted with compression fittings. First remove the plastic caps from inlet
and outlet. Insert the piping completely into the compression fitting. Than screw the nut hand tight. After that
screw with a jaw spanner 1 ¼ turns tight. Connect the relief tubing the same way.
6.4 REQUIRED QUALIFICATIONS FOR INITIAL START-UP AND CYLINDER
CHANGING
•
The test protocols from the piping according to tightness and if necessary, moisture and particles are
available
•
In process gas tubing is only standard gas (see 1.2)
•
The start-up is only realized by qualified personal
•
Wear safety clothes according to regulations
•
Use spark-free tools and provide before installation
•
Before first start-up check type label, if the component is suitable for the provided purpose (gas, pressure,
material, etc.)
14/36