Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Use - HANSGROHE PHARO Duschtempel 100 Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

I n i t i a l u s e
Perform the earthing in accordance to local regulati-
ons. The contacts must be free of oil and grease.
The earthing cable must be connected with
the protective conductor.
This can be made:
– at a central point, e.g. distributor, or
– at the main earthing conductor, or
– at a water supply with through conduction to earth
Power supply
The mains plug and the transformer must be freely accessible.
Connect the power supply cable with the transformer and
than connect the transformer with the mains supply
230 V ~ 50/60 Hz.
Thermostat alignment/motor alignment
To guarantee the function, perform after initial use the
alignment as described in chapter „Operating and servicing":
– Electrical Shower Temple, motor alignment (page 47)
– Manual Shower Temple, thermostat alignment (page 57)
Final checks
For perfect function check connect the Isiflex shower hose with
the Aktiva A8 hand shower. Include the mesh washer.
– No leaks?
– Are all areas sealed with silicon, free from acetic acid?
– Do the showers function?
– Does the lighting function?
– Has the thermostat been aligned?
– Is the customer informed and the customer envelope and the
installation instruction handed over?
– Is the warranty card filled out and sent to the manufacturer?
45

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis