Herunterladen Inhalt Inhalt Diese Seite drucken

Hatco TOAST-QWIK TQ-10 Installations- Und Bedienungshandbuch Seite 11

Elektrische umlauftoaster
Vorschau ausblenden Andere Handbücher für TOAST-QWIK TQ-10:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 15
INSTALLATION
ASSEMBLY
1. Remove unit from box.
2. Remove information packet. To prevent delay
in obtaining warranty coverage, fill out and mail
in warranty card.
3. Remove tape from Discharge Chute, Crumb Tray and Toast
Collector Pan. See 4 .
4. (TQ-10 & TQ-15 models only) If unit is not level, use 14 mm
(9/16") open-end wrench to adjust the foot of each leg until unit
is level.
LOCATION
CAUTION
Do not locate the toaster in an area subject to excessive
temperatures or grease from grills, fryers, etc. Excessive
temperatures could cause damage to the unit. Do not place
toaster in an area that restricts air flow around the front or rear
of the unit. Do not place toaster in direct discharge path of air
conditioning vent or makeup air vent.
WARNING
For safe and proper operation, the unit must be located
a reasonable distance from combustible walls and materials.
If safe distances are not maintained, discoloration
or combustion could occur. Do not locate toaster under shelving
or closer than 305 mm (12") from the ceiling.
WARNING
Allow a minimum of 25 mm (1") clearance along the sides.
Allow a clearance of 305 mm (12") along the front and rear
discharge to ensure proper operation and safety.
CAUTION
To avoid any injury or damage locate the unit at the proper
counter height, in an area that is convenient for use.
The location should be level to prevent the unit or its contents
from accidentally falling, and strong enough to support
the weight of the unit.
CAUTION
Do not place anything on top of the toaster; doing so could
damage toaster or subject personnel to possible injury.
SET-UP
CAUTION
Unit is not weatherproof. For safe and proper operation the unit
must be located indoors where the ambient air temperature
is a minimum of 70°F (21°C) and a maximum of 85°F (29°C).
CAUTION
The toasting of coated or buttered products such as garlic
bread, cheese sandwiches and sweet rolls is NOT recommended.
Residue will reduce toaster performance and could possibly
ignite inside the toaster.
CAUTION
When setting up the unit for operation, make sure power
to the unit is off and the toaster is at room temperature. Failure
to do so could result in personal injury.
Form No. TQ2CEM-0903
Toast Feed Ramp
The toast feed ramp is installed at the factory and can be used
in two positions. See 6 .
1. When in the upright position, the toaster is set for automatic
feed. Bread products enter the toaster by placing them
on the feed ramp and releasing.
2. For manual feeding of product, tip the feed ramp until it rests
on top of the unit. In this position bread products can be
manually loaded by placing directly on the conveyor belt.
Some exterior surfaces on the unit will get hot. Use caution
when touching these areas to avoid injury.
Toast Crumb Tray
Install toast crumb tray directly below the conveyor belt and below
the stop pins. Insert until the front of the crumb tray meets the stop
pins. See 7 .
To avoid damage to the unit or injury to personnel always
operate toaster with crumb tray installed.
To avoid any injury, do not remove the crumb tray for cleaning
until toaster is cool.
Front or Rear Discharge
Toast-Qwik units can be set up so toasted product discharges
at either the front or the rear of the unit.
TQ-10 & TQ-15 MODELS ONLY
The TQ-10 & TQ-15 models use a one piece discharge
chute/collector pan. The installation location determines
discharge area.
For front discharge install toaster chute from the front
of the toaster with the curved end inward and the rear lip
of the chute on the rear most pins. See 8 .
For rear discharge install toaster chute from the rear
of the toaster with the curved end in, and the lip of the chute over
the inside set of pins. See 9 .
TQ-400, -800 & -1200 SERIES
TQ-400, -800 and -1200 series toasters use a separate discharge
chute and collector pan.
For front discharge install the chute first by placing the curved
end inward until the rear lip of the chute is on the upper most set
of pins and the front slots on the chute are on the inside set of pins.
Position the collector pan, with the open end in first, over
the remaining sets of pins. Align slanted notches over the pins
and lower into place. See 10 .
For rear discharge the TQ-400, -800 and -1200 series toasters
do not use the discharge chute. If the chute is installed remove it.
To set-up toaster for rear discharge position, install the collector
pan, with the open end first, over the set of pins at the rear
of the unit. Align the straight notches over the pins and lower into
place. See 11 .
9
CAUTION
CAUTION
CAUTION

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis