Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing The Condensate Discharge; Assembl Of The Air Ducts And External Grids - Olimpia splendid UNICO AIR Handbuch Für Installation, Gebrauch Und Wartung

Inverter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 57
2
To prevent the creation of large amounts of dust and rubble due to drilling the core borer can be tted
applied b means of suction cups to the drilling zone.
To drill the holes proceed as follo s:
Fasten the drilling template to the all leaving the necessar space from the ceiling oor and side alls as sho n on the template
that ma be xed using adhesive tape.
Use a small drill or punch to mark
Using a core boring head measuring at least 162 mm to drill the t o holes for entr and exit of the air.
WARNING:
Most of the removed material is expelled out ards therefore make sure that it does not hit an person or ob ect hen it falls out.
In order to avoid as much as possible outer plaster breaking it is necessar to proceed carefull
decreasing pressure on core borers.
Next drill the holes for anchoring the fastening brackets to the all using as a rst option the 4 holes on the ends of the bracket
as sho n on the drilling template.
If the all is not ver solid it is advisable to use some extra anchor bolts.
As ou can see the bracket can be fastened in a number of different a s and positions. The ma orit of the eight of the appliance
is to the right side so ensure that xing is more secure on this side.The anchor bolts provided require holes ith a diameter of 10 mm.
In an case the all should be inspected carefull to determine the best possible anchorage and t pe of bolts suitable for parti-
cular situations.
WARNING: the manufacturer ill not be held liable for an underestimates made in the structural consistenc of the anchor pre-
pared b the installer.
Therefore pa utmost attention to the foregoing operation that could cause serious in ur /damage to people/propert if carried
out incorrectl .
When installing models equipped ith heating pump if no condensate discharge as built into the all (see paragraph 2.3.2) in
order to drain the condensate it ill be necessar to drill a hole through the all in the position sho n on the template.
2.3.3

Preparing the condensate discharge

As far as machines equipped ith a heating pump are concerned connect the unit to the condensate discharge pipe (supplied) b
coupling it ith the speci c vent ( g. 6 ref. A) that is on the back of the machine (remove cap B). When the max level is reached
a solenoid valve ensures the condensate
discharge pipe if ou intend running the unit at lo outdoor temperatures (lo er than 23°C).
Since condensate drains b gravit there must be a minimum slope of at least 3
or exible tube having an inside diameter of at least 16 mm.
If the line empties into a se erage s stem install a siphon before the point in hich the pipe reaches the main discharge at least
300 mm belo the inlet from the unit ( g. 6).
If the drainpipe drains into a vessel (tank or other container) this container should not be sealed and the drainpipe should not
remain immersed in the water (see g. 7).
The hole through hich the condensate pipe passes should al a s slope to ards the outside (see g. 8).
The exact position in hich to place the pipe inlet as compared to the machine is sho n on the drilling template.
CAUTION: make sure, in this case, that the water expelled outward does not damage or disturb persons or property.
During the winter this type of drainage may cause sheets of ice to form.
When the condensate drainage is tted pa much attention not to compress the rubber hose.
2.3.4
Assembly of the air ducts and external grids
After having drilled the holes insert the plastic sheet supplied ith the conditioner into them.
The length of the sheets must be 65 mm less than the thickness of the wall.
Roll the sheet and insert it into the hole ( g. 9)
upwards.
Use an ordinar cutter for the foregoing operation ( g. 9).
To position the external grids proceed as follo s:
-
Appl the seal ( g. 10 ref. B) to the all ange ( g. 10 ref. A) ensuring it lines up ith the outer edge of the ange as indicated
in the gure.
-
Fix the t o anges using 2 pegs having a diameter of 6 and check that the t o xing holes are horizontal.
-
Fit the small e elet of the spring
-
Insert the t o caps ( ith spring) on the front part of the external grid on its t o housings pulling until it clicks ( g. 12) and
30
ith extreme care the exact centre of each of the holes to be drilled.
ill o
out from the internal tra . For cold-onl machines connect the condensate
ith the long stem on the cap pin (on both components) ( g. 11).
ith a vacuum s stem
ith the last part of hole execution
at ever point of the discharge line. Use a rigid

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis