Herunterladen Inhalt Inhalt Diese Seite drucken

Setting Up The Clamping Position En - Abicor Binzel BRS-LCi SPS Betriebsanleitung

Brennerreinigunngsstation
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

BRS-LCi PLC
6.6 Setting up the clamping position
1
Gas nozzle
Fig. 10
Setting up the clamping position
 Fig. 7 Putting into operation on page EN-14
1 Move the torch with the gas nozzle (1) vertically to the tool axis (reamer axis) over the
BRS-LCi PLC (3) (P1).
2 Approach the clamping position (P2). Make sure that the cylindrical part of the gas nozzle (1) lies evenly
against the clamping prism (2).
1
2
Clamping prism
6 Putting into operation
2
3
3
BRS-LCi PLC cleaning station
EN - 17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis