Herunterladen Inhalt Inhalt Diese Seite drucken

Control Box - Abicor Binzel BRS-LCi SPS Betriebsanleitung

Brennerreinigunngsstation
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

BRS-LCi PLC

6.8.3 Control box

The control box regulates the sequence control and the rotary control.
It enables cycle monitoring and status indication.
1
1
HAN 3A5Q
2
HAN 16 A
3
Rotary check
4
Stroke down
Fig. 14
Control box
BRS pin assignment
Start torch cleaning output 24 V DC
Spray output ON 24 V DC
0 V DC
Continuous voltage 24 V DC
Torch cleaning finished input
Fig. 15
HAN 3A5Q pin assignment
2
5
Stroke up
6
Clamp open
7
Proximity switch (sensors)
8
Solenoid valves
Pin no.
1
2
3
4
5
PE
PE
3
4
5
6
7
14
9
Clamp
10 Cycle timeout
11 Ready
Pin no.
Start torch cleaning input 24 V DC
1
Spray input ON 24 V DC
2
0 V DC
3
4
Continuous voltage 24 V DC
Torch cleaning finished output
5
PE
PE
6 Putting into operation
8
9
10
11
13
12
12 Error
13 Stroke cylinder
14 Inject
EN - 21

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis