10.3

Operation

b
1
Hand lever
a
Ball valve closed
b
Ball valve open
Move the hand lever 1 to the desired
G
position.
1
5
2
2
4
3
5
1
Fully open or fully closed ball valve:
Hand lever 1 abuts travel stop 2.
The open position is infi nitely
variable but intermediate positions
cannot be engaged and locked.
1. Lift the hand lever locking device 3 to
enable turning the hand lever 1.
762
a
2
3
1
2
1
4
3
5
2. When the desired end position is
reached push down the hand lever
locking device 4 and make it engage in
the locking stop 5 (only possible when
the ball valve is fully open or fully closed).
3. When the ball valve is fully open or fully
closed and the hand lever 1 is engaged,
the position can be secured in the hole 6
in the hand lever 1 above the hand lever
locking device 3.
11

Commissioning

Corrosive chemicals!
Risk of caustic burns!
®
Check the tightness of the
G
media connections prior to
commissioning!
Use only the appropriate
G
protective gear when
performing the tightness
check.
Protect against leakage!
Provide precautionary measures
G
against exceeding the maximum
permitted pressures caused by
pressure surges (water hammer).
Observe pertinent standards prior
to commissioning.
Prior to cleaning or commissioning the
plant:
Check the tightness and the function of
G
the ball valve (close and reopen the ball
valve).
If the plant is new and after repairs rinse
G
the piping system with a fully opened
ball valve (to remove any harmful foreign
matter).
The plant operator is
responsible for selecting
the cleaning material and
performing the procedure.