Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Startup; Operation - Kärcher KM 85/50 R Bp Betriebsanleitung

Vorschau ausblenden Andere Handbücher für KM 85/50 R Bp:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Installing / connecting batteries
ATTENTION
Risk of damage as a result of incorrect polarity
Make sure you connect the cables to the correct terminals.
Battery plug connector
1
Battery negative terminal connection 1
2
Connection cable
3
Battery positive terminal connection 2
4
Retaining strap
5
Cover locking rod
6
Device controller plug connector
7
1. Remove the ignition key from the device.
2. Open the cover and secure it with the locking rod.
3. Place both batteries in the mount.
4. Fasten the batteries with the retaining strap.
5. Connect the cables as shown. Make sure that the terminal
caps are installed correctly.
6. Connect the battery plug connector to the device controller
plug connector for commissioning.
Charging batteries
DANGER
Risk of fatal injury from electric shock
Only operate the charger from an appropriate power supply with
sufficient fuse protection.
Only use the charger in dry rooms with sufficient ventilation.
ATTENTION
Risk of damage due to deep discharge
The device has deep discharge protection, i.e. when the permit-
ted minimum capacity level is reached, you have to drive the de-
vice directly to the charging station and avoid slopes.
ATTENTION
Risk of damage caused by charger
Do not connect the charger to the device controller plug connec-
tor.
Note
Adhere to the safety instructions for charging batteries.
Mains cable with IEC connector
1
Charger
2
LED displays
3
– yellow = battery charging
– green = battery > 80% charged
– green = battery fully charged
– red = fault
Charger plug connector
4
Battery plug connector
5
1. Shut down the device safely.
2. Open the cover completely.
The cover must remain open during the charging process.
3. Connect the charger plug connector to the battery plug con-
nector.
4. Connect the IEC connector to the charger. Connect the mains
cable to the domestic mains socket. The charging process be-
gins.
Carry out the charging process in accordance with the infor-
mation in the operating instructions for the charger.
5. Charge the batteries for 10-12 hours.
The recommended chargers (for the respective batteries) are
electronically controlled and stop the charging process auto-
matically.
1. Check the charging state of the battery.
a As necessary: Charge the battery.
2. Check the roller brush and side brush for any tangled pieces
of tape.
a The inspection can be made with the waste containers re-
moved.
b For safety reasons, tangled pieces of tape must only be re-
moved when removed.
3. Clean the dust filter with the manual filter cleaner.
4. Empty both waste containers.
5. Check the steering wheel to make sure the lock nut is firmly
tightened.
6. As necessary: Set the driver's seat and the steering wheel.
Setting the driver's seat
DANGER
Danger of accident
Only adjust the driver's seat when the device is standing.
Lever for horizontal seat adjustment
1
Driver's seat
2
1. Pull the seat adjustment lever to the left (in the direction of
travel).
2. Shift the driver's seat, release the lever and allow the seat to
click into place.
Move back and forth to check whether the driver's seat has
clicked into place.
Setting the steering wheel position
DANGER
Danger of accident
Only adjust the position of the steering wheel when the device is
standing.
English

Initial startup

Before startup

Operation

19

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis